Kehena House

The owner/builder positions wood joists within a steel frame bay. A wood sleeper is screwed to the top of the steel beams, and the joists hang on standard metal joist hangers. Later plywood sheathing will be installed over the joists and sleeper to complete the sub-floor assembly. This approach to floor construction is one of several that can be utilized with the HabiTek system.

Loading Image