Kehena House

Installation of the decking for the entry bridge is underway. The bridge railing components were pre-fabricated in Spokane and shipped to the site powder-coated and ready-to-assemble. Sub-components, such as railing systems, arrive at the site in a container along with the complete steel framework, with all required bolts and fasteners.